Skip to content
Menu
about

Project Timeline

Project Timeline

1968

August 1, 1968

Saif Bin Darwish Building at Old Souq Area in Abu Dhabi Storeys: 5 One of Saif Bin Darwish’s first buildings

1971

August 2, 1971

Darwish Bin Ahmed & Sons Building at Electra Street in Abu Dhabi Storeys: 7

1975

January 1, 1975

Abdullah Bin Darwish Building in Salam Street, Abu Dhabi Storeys: 7

1976

January 5, 1976

Saif Bin Darwish Building at Old Passport Road in Abu Dhabi No of Storeys : 9

1978

January 2, 1978

Humaid Building at Tourist Club Area in Abu Dhabi Storeys: 9

1981

January 1, 1981

Al Jaher Area Roads Construction of 40 km of roads and parking areas with tie in junctions to the Abu Dhabi – Al Ain expressway. Including all necessary earthworks, kerbing, utility works, drainage and footpaths Consultant: Freeman Fox International Year: 1981-1983

1982

January 1, 1982

Town Roads Sector W31/49 Abu Dhabi Construction of roads and parking areas to Abu Dhabi. Including all necessary earthworks, kerbing, utility works, drainage and footpaths. Client: Abu Dhabi Municipality Consultant: Italconsult Year: 1982-1984

1982

March 3, 1982

Al Murkhania Estate Roads Construction of 52 km of roads and parking areas. Inclusive of 10 km of dual carriageway road construction and four roundabouts. Including all necessary earthworks, kerbing, utility works, drainage and footpaths. Client: Al Ain Municipality Consultant: Freeman Fox International Year: 1982-1984

1984

September 3, 1984

Road Works In Various Areas To Al Ain (1) Construction of roads at cow farm in Al Maqam. (2) Construction of roads at private School in Zakher. (3) Construction of roads at Sheikh Suheem’s villa and Majis complex. Including all necessary earthworks, kerbing, utility works, roundabouts, drainage and footpaths. Client: Al Ain Municipality Consultant: Consor Consulting Engineers Year: 1984-1986

1984

October 4, 1984

Town Roads Sector W36/37/38 Abu Dhabi   Construction of roads and parking areas in Abu Dhabi. Inclusive of diversion of all existing services. New services 5 mtrs deep. Works included all necessary earthworks, kerbing, utility works, drainage and footpaths. Client: Abu Dhabi Municipality Consultant: The Samer Group Year: 1984-1986

1985

August 1, 1985

Stormwater Drainage Works At Sector W31/49 Abu Dhabi Supply and install 22,000 mtrs of new storm water drainage in pipe work 100-1600mm diameter in poor soil conditions. New services 5 mtrs deep. Diversion of all existing services. Client: Abu Dhabi Municipality Consultant: Italconsult Year: 1985-1986

1985

August 5, 1985

Trip Contract Number 13 – Ip 135 Supply and install 12,000 mtrs of new asphaltic concrete roads and parking areas, stormwater and sanitary sewers. Pipes 300-1800mm diameter in poor soil conditions with ground water 500mm below the surface. New services 5 mtrs deep. Diversion of all existing services. Two outfall structures were constructed on the drainage system. Client: Abu Dhabi Municipality Consultant: De Leuw Cather International Year: 1985-1987

1985

August 8, 1985

Various Access And Internal Roads To Shahma & Samha Villages, Abu Dhabi Construction of roads and parking areas, including all necessary earthworks, kerbing, utility works, roundabouts, drainage and footpaths. New services 2 mtrs depth. Ground conditions of sand and rock. Client: Public Works Department, Abu Dhabi Consultant: Roughton and Partners Year: 1985-1988

1987

January 5, 1987

Shuwaib Reservoir – Stage II Construction of an earth dam and weir for Shuwaib Reservoir Wadi Protection – Earthworks, concrete, stone pitching and gabions.

1987

February 5, 1987

Trip Contract Number 18 Mc – Al Salaam Street Construction of roads and parking areas in Abu Dhabi. Inclusive of diverting all existing services. New services 5 mtrs deep. Works included all necessary earthworks, kerbing, utility works, drainage and footpaths. Drainage works exceeded 7,000 mtrs length and incorporated 250 sewer house connections. Water line construction works exceeded 2,000 mtrs. Client: Abu Dhabi Municipality Consultant: De Leuw Cather International Year: 1987-1990

1987

August 8, 1987

Shuwaib Reservoir – Stage I Construction of an earth dam and weir for Shuwaib Reservoir Wadi protection. Including all necessary earthworks, drainage, footpaths, concrete works, stone pitching and gabions. Client: Al Ain Municipality Consultant: Freeman Fox International Year: 1987-1989

1987

August 11, 1987

1987

Liwa Roads (Western Region) Construction of 45 kms of dual carriageway and all associated side roads. 7,000,000 mtrs3 of road embankment and earth moving works. Works included for all necessary drainage, footpaths and utility works etc. Client: Abu Dhabi Municipality Consultant: Italconsult Year: 1987-1990

1988

February 16, 1988

Roads And Parking For Abu Samra And Al Maqam Camel Race Area Construction of roads and parking areas including all necessary earthworks, kerbing, utility works, drainage and footpaths. Client: Al Ain Municipality Consultant: Spectrum Engineering Consultants Year: 1988-1989

1988

March 14, 1988

HHSheikh Zayed Bin Sultan Al Nahyan Palace Roadways Construction of roads and pathways in and around the palace at Al Khaznah. Including all necessary earthworks, drainage, footpaths, utilities etc. Client: Al Ain Municipality Consultant: Asie Etudes Stup International Year: 1988-1989

1988

April 11, 1988

Shuwaib Reservoir – Part A Construction of a reservoir. Works including all necessary earthworks, drainage, footpaths, concrete works, stone pitching and gabions. 3,500,000 mtrs3 of excavation works. Client: Al Ain Municipality Consultant: Consor Consulting Engineers Year: 1988-1990

1989

January 19, 1989

Shuwaib Reservoir – Part F Construction of a reservoir. Works including all necessary earthworks, drainage, footpaths, concrete works, stone pitching and gabions. 6,000,000 mtrs3 of excavation works. Client: Al Ain Municipality Consultant: Consor Consulting Engineers Year: 1989-1990

1989

May 10, 1989

Shuwaib Reservoir – Part C Construction of a reservoir. Works including all necessary earthworks, drainage, footpaths, concrete works, stone pitching and gabions. 6,250,000 mtrs3 of excavation works. Client: Al Ain Municipality Consultant: Consor Consulting Engineers & H Humphreys Year: 1989-1990

1990

January 3, 1990

Sand Dune Leveling At Sweihan   Leveling 5,000,000 mtrs2 of sand dune area for agricultural development. Client: Al Ain Municipality Consultant: Sir Alexander Gibb Year: 1990-1990

1990

February 5, 1990

Town Roads Sector W18/03, 28 And 29 Bateen   Construction of new town roads and parking areas. Works including all necessary earthworks, drainage, footpaths and water pipeline installations. Client: Abu Dhabi Municipality Consultant: Samer Group Year: 1990-1992

1990

March 5, 1990

Maintenance Of Dhaid, Fujairah, Khor Fakkan, Dibba And Massafi Roads   Maintenance of dual carriageways and shoulders. Replacement of signage, road furniture and guardrails. Repairs to structures and bridges. Client: Ministry of Public Works & Housing Consultant: Jouzy & Partners Year: 1990-1991

1990

March 7, 1990

Baniyas Town Roads Sector Eb 1/05-06   East Baniyas Town Roads Sector 1/05-06 Construction of new town roads and parking areas. Works including all necessary earthworks, drainage, footpaths, utilities and sewerage system. Client: Abu Dhabi Municipality Consultant: DIWI Consult Year: 1990-1992

1990

April 13, 1990

Maintenance Of Sharjah, Ras Al Khaimah, Dhaid Roads   Maintenance of dual carriageways and shoulders. Replacement of signage, road furniture and guardrails. Repairs to structures and bridges. Client: Ministry of Public Works & Housing Consultant: Jouzy & Partners Year: 1990-1991

1990

June 14, 1990

1990

Maintenance Of Sharjah, Ras Al Khaimah, Dhaid Roads   Maintenance of dual carriageways and shoulders. Replacement of signage, road furniture and guardrails. Repairs to structures and bridges. Client: Ministry of Public Works & Housing Consultant: Jouzy & Partners Year: 1990-1991

1991

February 6, 1991

Town Roads For 40 Housing Units In Al Maqam   Construction of all new internal town roads and parking areas. Works including all necessary earthworks, drainage, footpaths and street lighting. Client: Al Ain Municipality Consultant: University Engineers Consulting Group Year: 1991-1992

1991

February 7, 1991

Abu Dhabi Sewerage Scheme 121/8   Construction of a new gravity sewerage system in sectors E18/10 and 02 Abu Dhabi, including all house connections. The supply and installation of a new telemetery system for the entire Abu Dhabi sewerage system and the construction of two new computerized control centers. Client: Abu Dhabi Municipality Consultant: John Taylor & Sons Year: 1991-1993

1991

March 14, 1991

Sand Dune Leveling At Umm Aloash   Filling 13,000,000 mtrs3 of sweet sand to create agricultural areas. Client: Al Ain Municipality Consultant: Al Ain Municipality Roads Section Year: 1991-1992

1991

April 5, 1991

Ancillary Works To The Al Ain Area   The placing of sub-grade material on the leveled areas for agricultural development in the Sweihan to Al Hayer Road areas. Works were over an area exceeding 11,000,000 mtrs2. Client: Al Ain Municipality Consultant: University Engineers Consulting Group Year: 1991-1992

1991

May 24, 1991

Shuwaib To Al Madam Road Project   Construction of new single carriageway road and the renovation and repair of the existing roads. Works included all necessary earthworks, kerbing, utility works, drainage and footpaths. Client: Emirate of Abu Dhabi Public Works Department Consultant: Jouzy & Partners Year: 1991-1992

1992

January 2, 1992

1992

Road Development For Towayya And Masoudi Areas In Al Ain   Comprehensive road construction and parking areas project. Inclusive dual carriageway road construction, roundabouts and junctions. Including all necessary earthworks, kerbing, utility works, drainage, footpaths, signage and road furniture. Client: Al Ain Municipality Consultant: Freeman Fox International

1992

March 11, 1992

Sewerage And Stormwater Drainage Works In Mussafah Adss-412   The construction of a new gravity sewerage and stormwater drainage system for a proposed housing development. Client: Abu Dhabi Municipality Consultant: Dorsch Consult Year: 1992

1992

June 17, 1992

1992

Madinat Baynounah, Madinat Zayed Internal Roads And Dual Carriageways   Construction of dual carriageway roads, internal roads and parking areas. Inclusive of roundabouts and access/egress junctions. Including all necessary earthworks, kerbing, utility works, drainage, footpaths, signage and road furniture. Client: Emirate of Abu Dhabi Public Works Department Consultant: Integrated Design Bureau Year: 1992-1994

1993

February 3, 1993

Rock Leveling In Al Ain   Rock leveling and sub-grade filling. Land area over approximately 400,000 mtrs2. Client: Al Ain Municipality Consultant: Cansult Year: 1993

1993

June 17, 1993

Al Shahama Interchange, Abu Dhabi   Comprehensive road construction and bridge works. Works were to construct a double 4 lane carriageway with all associated works, roundabouts and junctions, and the construction of a 2 span bridge totaling 70 mtrs. Roadway and bridge included all necessary earthworks, kerbing, utility works, drainage, footpaths, signage and road furniture. Client: Emirate of Abu Dhabi Public Works Department Consultant: Halcrow International Partners Year: 1993-1996

1993

November 4, 1993

Contract M-33 Falaz Hazza – Phase Ii   Comprehensive internal roadway construction project. Works included all stormwater installations, sewerage installations, house connections, and all necessary earthworks, kerbing, footpaths, street lighting, signage and road furniture. Client: Al Ain Municipality Sanitary Drainage Projects Committee Consultant: D Balfour & Sons Year: 1993-1996

1994

January 12, 1994

1994

Internal Roads At Shuwaib   A complex internal roadway construction project. The construction of roads and all associated services for 200 new and existing houses. Works included all stormwater installations, sewerage installations, house connections, and all necessary earthworks, kerbing, footpaths, street lighting, signage and road furniture. Client: Emirate of Abu Dhabi Public Works Department Consultant: Frederic R Harris Inc Year: 1994-1996

1994

February 10, 1994

1994

Development Of Towayya Area (Roadworks) Stages I & Ii   Comprehensive single and dual carriageway road construction project. Works were to construct a double 4 lane carriageway and single roadway with all associated works, roundabouts and junctions, included all necessary earthworks, kerbing, utility works, drainage, footpaths, signage and road furniture. Client: Al Ain Municipality Consultant: Freeman Fox International Year: 1994-1996

1994

August 12, 1994

Minor Works In Al Ain   Land contouring in Suliemat, Al Ain. Client: Al Ain Municipality Consultant: N/A Year: 1994-1995

1995

March 8, 1995

1995

Minor Works In Al Ain   Land contouring in Agabiya, Al Ain. Client: Al Ain Municipality Consultant: N/A Year: 1993

1996

March 6, 1996

1996

Internal Roads For Zayed Military City At Al Shahama   Construction of new internal roads and parking areas. Works including all necessary earthworks, drainage, footpaths, utilities, sewerage system, street lighting, signage and road furniture. Client: Abu Dhabi Municipality Consultant: Ital Consult Year: 1996-1997

1997

March 11, 1997

Internal Roads At Medinat Zayed & Baynounah   Construction of roads and parking areas including all necessary earthworks, kerbing, utility works, drainage, footpaths, lighting, signage and road furniture. Slope protection was also part of the contract. Client: Emirate of Abu Dhabi Public Works Department Consultant: Frederic R Harris Inc Year: 1997-1999

1997

March 12, 1997

1997

Construction of 14 km of two lane dual carriageway road with parking areas, inclusive of junctions. Project included three camel underpasses, gas pipeline protection structures, associated major earthworks, all necessary kerbing, utility works, drainage, footpaths, signage and road furniture. Client: Ministry of Public Works and Housing, Dubai Consultant: Nespak Year: 1997-1998

1998

January 1, 1998

Abdullah Bin Darwish Building in Salam Street, Abu Dhabi   The Abdulla Darwish Building in Salam street stands at 22 storeys and is one of Abu Dhabi’s first steel structure buildings.

1998

January 5, 1998

Humaid Building at Tourist Club Area in Abu Dhabi Storeys: G+11

1998

February 11, 1998

1998

Meizeria (Liwa) To Madinat Zayed – Contract 3b   Construction of a 19 km dual carriageway expressway. Works included all associated activities connected with roundabouts and junctions, included all necessary earthworks, kerbing, utility works, drainage, footpaths, signage and road furniture. Camel / vehicle underpass culverts, ducts and utility relocations were also included. Client: Emirate of Abu Dhabi Public Works Department Consultant: Ove Arup & Partners International Year: 1998-1999

1998

April 14, 1998

1998

Meizeria (Liwa) To Madinat Zayed – Contract 3c   Construction of a 20 km dual carriageway expressway. Works included all associated activities connected with roundabouts and junctions, included all necessary earthworks, kerbing, utility works, drainage, footpaths, signage and road furniture. Camel / vehicle underpass culverts, ducts and utility relocations were also included. Client: Emirate of Abu Dhabi Public Works Department Consultant: Ove Arup & Partners International Year: 1998-1999

1998

August 2, 1998

Saif Bin Darwish Building at Old Souq Area in Abu Dhabi (Rebuild) In 1998 the original building (built in 1968) was demolished and replaced with this existing 18 storey building.

1999

January 4, 1999

Saif Bin Darwish Building at Old Passport Road in Abu Dhabi Storeys:10 This building was originally built in 1976 and then rebuilt in 1999.

1999

January 7, 1999

Darwish Bin Ahmed & Sons Building at Electra Street in Abu Dhabi Originally this building was first built in the early 1970’s; in 1999 Saif Bin Darwish rebuilt this into a 22 storey building right in the heart of Abu Dhabi.

2000

February 9, 2000

2000

The Tarif Interchange (Tarif – Madinat Zayed – Liwa) Contract 2a The construction of a major dual carriageway expressway. Works included all associated activities connected with roundabouts and junctions, included all necessary earthworks, kerbing, utility works, drainage, street lighting, footpaths, signage and road furniture. Client: Works Department, Abu Dhabi Consultant: Ove Arup & Partners International Year: 2000-2002

2000

February 9, 2000

Maintenance, Improvement And Upgrading Of Roads And Culverts Phase 1 Group 2 (Dhaid – Fujairah Road & Link Siji – Khorfakkan Road) The maintenance of dual carriageways, single lane roadways, shoulders, bridges and culverts. Replacement of signage, road furniture and guardrails. Repairs to structures. Client: Ministry of Public Works & Housing, Dubai Consultant: Cansult Year: 2000-2002

2000

April 12, 2000

2000

Maintenance, Improvement And Upgrading Of Roads, Bridges And Culverts (Phase 1), Group 1 Sharjah – Dhaid The comprehensive maintenance to dual carriageways and bridges in the Sharjah to Dhaid area. Client: Ministry of Public Works & Housing, Dubai Consultant: Ital Consult Year: 2000-2001

2000

April 12, 2000

Town Roads In Mussafah West – Contract 960/3 Construction of new town roads and parking areas. Works including all necessary earthworks, drainage, sewerage, footpaths, lighting, and water pipeline installations. Client: Abu Dhabi Municipality Consultant: Cole, Sherman & Associates Year: 2000-2002

2000

May 16, 2000

Sewerage And Internal Roads Contract M39 Al Ain   Construction of new town roads and parking areas. Works including all necessary earthworks, drainage, footpaths, utilities and sewerage system. Client: Al Ain Municipality Consultant: Gibb Year: 2000-2002

2001

January 10, 2001

2001

Earthworks In Al Falah & Al Heeliah Land contouring of 7,300,000 mtrs3. Client: Emirate of Abu Dhabi, Public Works Department Consultant: Al Sweidi Engineers & DIWI Consultants Year: 2001-2002

2001

January 18, 2001

Leveling Earthworks & Road Works In Saih As Sidirah Land contouring of 6,000,000 mtrs3 and the construction of 11km of roadway in Saih As Sidirah. Client: Al Ain Municipality Consultant: Gibb Year: 2001

2002

January 24, 2002

Land Contouring At Zone 1c Al Dhafra Air Base (Contract Mw-Af-100-2001) The supply and compaction of earthworks. Client: GHQ Armed Forces Directorate of Military Works, Abu Dhabi. Consultant: Stanley Consultants Inc. Year: 2002-2003

2002

April 19, 2002

2002

Construction of dams and recharge facilities at Wadi Al Manama – Ajman, UAE Construction of dams and recharge facilities at Wadi Al Manama – Ajman, UAE Consultant:Consor Consulting

2003

January 1, 2003

Construction Of External Perimeter Barrier For Air Base Improvements The construction of an external perimeter barrier for the Armed Forces Air Base. Inclusive of all necessary earthworks and signage. Client: GHQ Armed Forces Directorate of Military Works, Abu Dhabi. Consultant: Stanley Consultants Inc Year: 2003-2004

2003

January 3, 2003

Construction Of Branch Road To Siji Explosive Construction of a branch road including all associated activities connected with earthworks, kerbing, utility works, drainage, footpaths, signage and road furniture. Client: Fujairah Municipality Consultant: N/A Year: 2003

2003

February 12, 2003

2003

Land Contouring At Zone 1c Al Dhafra Air Base (Contract Mw-Af-003-2003) The supply and compaction of earthworks. Including all associated drainage works. Client: GHQ Armed Forces Directorate of Military Works, Abu Dhabi. Consultant: Stanley Consultants Inc. Year: 2003

2003

March 6, 2003

Land Contouring At Al Khazna The removal of debris and subsequent leveling works. Client: Al Ain Municipality Consultant: Gibb Middle East Year: 2003-2004

2003

March 19, 2003

2003

Land Contouring At Al Dhafra Air Base (Contract Mw-Af-330-2002) Client: GHQ Armed Forces Directorate of Military Works, Abu Dhabi. Consultant: Stanley Consultants Inc. Year: 2003

2003

April 17, 2003

Land Contouring And Debris Removal At Al Nahyan Military Camp The removal of debris and subsequent leveling works.. Client: GHQ Armed Forces Directorate of Military Works, Abu Dhabi. Consultant: Stanley Consultants Inc. Year: 2003

2004

January 15, 2004

2004

Ibn Battuta Mall Shopping Mall – The Complete External Works Package Construction of all the roads and pathways in and around the Shopping Mall. Including all necessary earthworks, drainage, footpaths, utilities, parking areas, landscaping, signage etc. Client: Nakheel Consultant: Dewan El Emara & Turner Construction International Year: 2004-2005

2004

February 20, 2004

Maintenance And Repair Works To Roads And Bridges In Al Ain The extensive maintenance and repair of roads and bridges in Zone II Al Ain. Works included structural repairs to support structures etc. General repair activities included embankment works, kerbing, utility works, drainage, footpaths etc. Client: Al Ain Municipality Consultant: WS Atkins & Partners Overseas Year: 2004-2006

2004

March 10, 2004

Town Roads And Protection Works In Green Mubazzara Construction of all new internal town roads and parking areas. Works including all necessary earthworks, drainage, footpaths and street lighting. Client: Al Ain Municipality Consultant: WS Atkins & Partners Overseas Year: 2004-2005

2004

April 15, 2004

Road Construction The construction of a branch road from the Al Saad Interchange to the Trunk Road, including all associated activities connected with earthworks, kerbing, utility works, drainage, footpaths, signage and road furniture. Client: Al Ain Municipality Consultant: DIWI Consult Year: 2004

2004

April 21, 2004

2004

Al Ain – Al Wagan – Al Qua’a Road (Contract 2) Construction of new carriageway road including all necessary earthworks, kerbing, utility works, drainage, signage and footpaths etc. Client: Al Ain Municipality Consultant: Ital Consult Year: 2004-2008

2005

January 13, 2005

Construction Of Boarder Road From Ras Al Ghumais To Al Beiryer (Contract MW-OU-250-2005) A comprehensive 200 km 4 mtr wide roadway project. Works included all earthworks, kerbing, footpaths, street lighting, signage and road furniture. Client: UAE Armed Forces, Directorate of Military Works Consultant: N/A Year: 2005-2006

2005

March 9, 2005

Construction Of Boarder Road From Al Beiryer To Umm Al Zamoul (Contract MW-OU-251-2005) A comprehensive 185 km 4 mtr wide roadway project. Works included all earthworks, kerbing, footpaths, street lighting, signage and road furniture. Client: UAE Armed Forces, Directorate of Military Works Consultant: N/A Year: 2005-2006

2005

March 10, 2005

Rehabilitation Of Jebel Ali – Lihbab Road – Phase 2 (Contract R709/2) Major civil engineering project involving debris removal, land contouring and the construction of new town roads and associated parking areas including all necessary earthworks, drainage, sewerage, footpaths, lighting and water pipeline installations. Client: Dubai Roads & Transport Authority Consultant: Cansult Year: 2005-2008

2005

March 16, 2005

Expansion Of Abu Dhabi International Airport Runway Under high specification the groundworks grading for a 2km extension to the airport runway. Client: Supervision Committee for the Expansion of the Abu Dhabi International Airport Consultant: Halcrow International Partnership & Parsons International Year: 2005-2007

2006

January 4, 2006

Construction Of Ducts For The Sharian Project, Northern And Southern Region Construction of all ducts inclusive of earthworks and materials. Client: UAE Armed Forces, Directorate of Military Works Consultant: N/A Year: 2006-2007

2006

January 17, 2006

Town Roads In Al Qusaia – Contract R815   The construction of new town roads and associated parking areas. Works including all necessary earthworks, drainage, sewerage, footpaths, lighting and water pipeline installations. Client: Dubai Roads & Transport Authority Consultant: Alturath Consulting Engineers Year: 2006-2007

2006

January 18, 2006

Construction, Completion & Maintenance Of Roads (Contract 1) – Dhadna, Taween, Khliebeh, Idhen   The construction of new carriageway roads including all necessary earthworks, kerbing, utility works, drainage, signage and footpaths etc. The maintenance of roadways including all required structural repairs. Client: Dubai Ministry of Public Works Consultant: Conser Consulting Engineering Services Year: 2006-2008

2006

March 16, 2006

Town Roads And Leveling Works In Al Barsha’a South – Contract R801   Extensive works involving the construction of new town roads and associated parking areas including all necessary earthworks, drainage, sewerage, footpaths, lighting and water pipeline installations. Comprehensive leveling works to required gradients. Client: Dubai Roads & Transport Authority Consultant: Al Burj Africon Year: 2006-2008

2007

January 2, 2007

2007

The Expansion Of Abu Dhabi International Airport (Contract 1.5.3.2) & New Remote Hardstanding (Contract 1.5.8)   A major land preparation project. The removal of debris and the grading and leveling of land associated with the Airport. The construction of new remote hardstanding areas. Client: Supervision Committee for the Expansion of Abu Dhabi International Airport Consultant: Stanley Consultants and Gibb Consultants Year: 2007-2009

2007

January 10, 2007

Saadiyat Link Project – Earthworks (Contract U0523)   The removal of debris and subsequent leveling works. Client: Tourism Development & Investment Co Consultant: Parsons International Year: 2007

2007

January 10, 2007

Access Road Construction (Contract Cc-8808)   The construction of numerous access roads and parking areas to Emirates Aluminum Co. Included all necessary earthworks, kerbing, utility works, drainage and footpaths. Client: Emirates Aluminum Co (EMAL) Consultant: SNC & Lavalin & Worley Parsons Year: 2007-2008

2007

February 1, 2007

Site Preparation For Emirates Aluminum Co At Taweelah Site Location (Contract Cc-1019)   Extensive debris removal, ground contouring and leveling works. Client: Emirates Aluminum Co (EMAL) Consultant: SNC & Lavalin & Worley Parsons Year: 2007-2008

2008

September 1, 2008

Saadiyat Bridge Project – Mina Link Temporary Road Earthworks, Subbase and base courses, asphalt works, concrete works, strom water drainage system, water works, traffic marking and signs, metal works

2009

March 31, 2009

Abu Dhabi International Airport Midfield Grading Construction – East Midfield Demolition & site Clearance, Earthworks & Miscelleneous works

2012

January 2, 2012

2012

Sheikh Khalifa Bridge (Saadiyat Bridge) (Featured)   A major bridge was constructed over the creek between the Saadiyat Island and the Abu Dhabi City. The entire area of the island shall be endowed with the tourism related facilities in order to promote the tourism industry of the Abu Dhabi Emirate.

2012

March 6, 2012

2012

Upgrading Of Salam Street And Eastern Corniche Road To An Expressway(Featured)   Municipality of Abu Dhabi has undertaken major road development schemes on the existing Salam Street in Abu Dhabi City in three sections and the most intricate section was awarded to the Joint-Venture, Samsung-Saif Bin Darwish in 2008 to be completed at the end of 2011.

2012

July 17, 2012

The Expansion Of Abu Dhabi International Airport (Featured)   The project comprise of 10,900m2 area of concrete paving for the New Abu Dhabi International Airport Hardstand, Airfield Lighting, utilities storm water, domestic water etc.

2012

November 8, 2012

Construction, Completion And Maintenance Of South Shamkha Infrastructure At Abu Dhabi – Lot 4 (Featured)   The Project “Construction, Completion and Maintenance of South Shamkha Infrastructure at Abu Dhabi – LOT 4 ” undertaken by the Abu Dhabi General Services PJSC Trading as MUSANADA was awarded to Saif Bin Darwish by the mid of year 2011.